The Challenge CompuCycle’s Fortune 1000 customer was in need of data center decommissioning to remove all server and network equipment from a 3rd party datacenter. 76 Complete 7-foot racks, cabling, overhead structures, and 30 tape storage cabinets and furniture needed to be removed. The 3rd party data center required everything between the surface of the raised floor up to the all-thread rods that hung through the ceiling tiles to be securely packed…