
The plant is slated to begin production in mid-2027, with an annual capacity of 50,000 units on a single shift once fully ramped up.
For details, please visit CnEVPost.
Date:

The plant is slated to begin production in mid-2027, with an annual capacity of 50,000 units on a single shift once fully ramped up.
For details, please visit CnEVPost.