Engineering takeaway: PPWR should be treated as a design input at project kickoff, not as a compliance check after the package has already been engineered, decorated and qualified.
![]()
Date:
Engineering takeaway: PPWR should be treated as a design input at project kickoff, not as a compliance check after the package has already been engineered, decorated and qualified.
![]()