When you install a solar and/or battery system with an inverter output over 3.68 kW, you will need to apply for and gain permission from your local Distribution Network Operator (DNO).
![]()
Date:
When you install a solar and/or battery system with an inverter output over 3.68 kW, you will need to apply for and gain permission from your local Distribution Network Operator (DNO).
![]()